Five steps.
No mystery.
Every reinstatement follows the same discipline. Cutting corners on any one of these steps is why bad resin repairs fail — so we don't.

Assessment
We visit, look at the damage or excavation, agree the scope, and match the aggregate mix against your existing surface. Nothing starts without you signing it off.

Break out & clean
The damaged resin comes out. Loose backfill, rubble and dust removed. We take away what shouldn't be there — no fly-tipping in your bin.

Sub-base reset
The right depth. The right fall for drainage. The right compaction. Skip this step and the repair fails in a winter. We don't skip it.

Resin-bound laid
Aggregate mixed on-site to the ratio your driveway was originally laid to. Hand-trowelled to a seamless edge with your existing surface.

Cured & guaranteed
Walk on it in a few hours. Drive on it the next day. Written 2-year guarantee handed to you before we leave.
Questions before we start?
Ask them. We'd rather explain twice than surprise you once.
